The Project

Redvale Landfill

Solo Plastics were please to be chosen for the Redvale landfill development phases 14,15 and 16.

The work involved using PPS-Frank pipe DN1200mm and DN800mm SDR11 to fabricate leachate manholes and pipe work.

The manholes under construction in the companies factory showing the two DN1200mm manhole risers near completion in heights of 6meters and 2.5meters.

Interconnection flanged pipework at the base was DN800mm and the DN500mm connections for the gas header pipe connections.

 

redvale01.jpg